<font id="9bmwb"><tbody id="9bmwb"><var id="9bmwb"></var></tbody></font>
  • <wbr id="9bmwb"><meter id="9bmwb"></meter></wbr>
    <u id="9bmwb"><sub id="9bmwb"></sub></u>
  • <input id="9bmwb"></input>
    <input id="9bmwb"></input>
    1. <wbr id="9bmwb"><big id="9bmwb"><p id="9bmwb"></p></big></wbr>


      EngLish | ÖÐÎÄ°æ  
      Drilling Mud Purification System
      LW Drilling Mud Decanter Centrifuge
      LW Large Displacement Decanter Centrifuge
      GLW High-Speed Centrifuge
      GLW-BP400 High-Speed Variable Frequency Centrifuge
      Sand Pump
      Vertical Sand Pump
      Shear Pump
      NJ Mud Agitator
      NJC Gear Type Mud Agitator
      Submersible Slurry Pump
      SB100¡Á80 Mud Pump
      Metering Pump
      Desilter
      Desander
      Vacuum Degasser
      Mud Cleaner
      Mud Gas Sepatator
      Jet mixing device
      Flare Ignition Device
      Mud Gun
      Shale Shaker
      Venturi Hopper
       
        The current position£ºHome > Vertical Sand Pump
      Last         Next
      ¡¡¡¡¡¡Product description
      Generals:

      SBL 150 pump is a vertical centrifugal pump of single stage and end suction type. It is mounted at the tank top and its body is sub-merged in the tank liquid with no pollution. This product employs the twin seal consisted of slave blade and oil seal is reliable, and its service life is long. Therefore, it is an ideal pump for petroleum and mine.

      Application:

      This pump is used mainly for transporting mud, sand, mineral and other similar liquid containing float solid grain. For example, it can be used in the mud purification system in petroleum drilling and in dressing plant for transporting mineral paste, tail mine, coal mud, etc.
      Mounting, Operation and Maintenance:
      1. With its base fixed, mount it at tank top (or pool top). The distance from the lower suction pipe end to the tank bottom should be more than 500mm. Its discharge piping should be provided with stop valve in order to regulate its flow and lift. No sharp turns in the piping. No external load applies on the piping.
      2. Before starting the pump, check the motor for correct rotation direction. When starting the pump, close the stop valve on the discharge pipe. After starting the pump, adjust the valve slowly, making the flow or pressure meet the operation requirement.
      3. Inspect bearing¡¯s lubrication at a regular time, each class of replenishment 32#lubricating oil one time.

      Main technical parameters:

      Model

      Flow m3/h

      Lift m

      Speed r/min

      Shaft power

      Efficiency %

      Motor power

      SBL150

      150

      28

      1480

      19.1kw

      60

      37kw

      SBL150

      180

      31

      1480

      25.3kw

      61

      45kw

      SBL150

      200

      33

      1480

      30kw

      61

      55kw

      Hits£º8262  Edttime£º2011/10/27 ¡¾Print this page¡¿ ¡¾Close¡¿
      Copyright @ Dongying Yongji Petroleum Machinery Company Limited
      五月天AV免费观看_国产专区国产av一区_精品亚洲成a人在线_亚洲+日韩+国产+中文有码